Ir al contenido

Cetec Project Value Rubber: The pilot plant prototype is already installed

21 de abril de 2021 por
Cetec Project Value Rubber: The pilot plant prototype is already installed
Diseño

 

Of course, much work remains to be done, but the first devulcanized pellets from end-of-life tires are already in our hands.

Your Dynamic Snippet will be displayed here... This message is displayed because you did not provide both a filter and a template to use.